Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide a water treatment system for our property aldrich lane fields.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes improvements to the village water treatment system which includes new well pumps, piping, plumbing and electrical work to install a new pressure filter system.
Posted Date
Dec 30, 2025
Due Date
Jan 14, 2026
Release: Dec 30, 2025
Close: Jan 14, 2026
Work includes improvements to the village water treatment system which includes new well pumps, piping, plumbing and electrical work to install a new pressure filter system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract to provide closed loop industrial water treatment recycle system. To provide and install a water treatment recycle system for the auto wash bay. Product: closed loop industrial water treatment recycle system with 3,030 gallons per day process rate @ 15 gallons per minute. Includes a pressure relief valve, replacement cartridge filter, and a pump with float switch.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Contract to provide closed loop industrial water treatment recycle system. To provide and install a water treatment recycle system for the auto wash bay. Product: closed loop industrial water treatment recycle system with 3,030 gallons per day process rate @ 15 gallons per minute. Includes a pressure relief valve, replacement cartridge filter, and a pump with float switch.
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Sep 2, 2025
Due Date
Feb 3, 2026
Release: Sep 2, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableProject consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
Project consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →