Higher EducationIA
Posted
Jul 20, 2026
Sep 30, 2026
Drainage Water Recycling - Franklin County
Work shall generally consist of 49,500 CY of excavation, drainage pump station and controls, 1,400 LF of 10" diameter fusible HDPE force main, 1,500 LF of single wall HDPE ranging in size between 8" to 15", fabrication of a manifold flow control system, related work items, and all incidentals required to complete the project.