Aug 14, 2026
Closes
Sep 10, 2026
Olsen Addition Main Replacement (Invitation To Bid)
Work includes 1 LS of erosion control (swppp preparation, installation, maintenance, and removal); 25 SY of alley surface material; 17,586 SY of apply asphalt emulsion slurry seal coat, type ii, quick setting, to entire roadway width; 37,198 LF of seal and fill pavement cracks; 10 LF of sawcut, remove, and replace curb and gutter per mag std. Det. 220-1, type "a", joint to joint; 320 LF of sawcut, remove, and replace roll curb and gutter per mag std. Det. 220-1, type "c", joint to joint; 2,725 SF of sawcut, remove, and replace, full width of concrete sidewalk to nearest joint per mag std. Det. 230; etc, see attached file.