Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Inventory Insulated Coveralls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide switchgears, air insulated.
Posted Date
Nov 27, 2025
Due Date
Dec 16, 2025
Release: Nov 27, 2025
Close: Dec 16, 2025
Provide switchgears, air insulated.
AvailablePremium
Access the largest public sector contact database
The purchase of cold weather coveralls. 494 Coveralls with the following characteristics: Low static producing with a material that is not highly susceptible to melting - ideally a Cordura/Denim tear resistant fabric. The manufacturer must offer Short, Regular and tall sizes in M, L, XL and 2XL, Engineered for Extreme warmth in the coldest conditions, Wind-resistant, water-repellent, and insulated, Knees should be reinforced, Should have securable pockets, They require sleeves, Color must be either Operational Camouflage Pattern (OCP) printed, Black, or Coyote, Brown (or a closely similar brown).
Posted Date
Nov 18, 2025
Due Date
Dec 12, 2025
Release: Nov 18, 2025
Close: Dec 12, 2025
The purchase of cold weather coveralls. 494 Coveralls with the following characteristics: Low static producing with a material that is not highly susceptible to melting - ideally a Cordura/Denim tear resistant fabric. The manufacturer must offer Short, Regular and tall sizes in M, L, XL and 2XL, Engineered for Extreme warmth in the coldest conditions, Wind-resistant, water-repellent, and insulated, Knees should be reinforced, Should have securable pockets, They require sleeves, Color must be either Operational Camouflage Pattern (OCP) printed, Black, or Coyote, Brown (or a closely similar brown).
The City of Austin (Austin Energy) is soliciting bids to supply air-insulated switchgears (IFB). Award(s) will be made to low responsive, responsible bidder(s); contract is for indefinite quantities. Electronic submission via Austin Finance Online eResponse is required; local/small business bid discounts apply in evaluation.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
The City of Austin (Austin Energy) is soliciting bids to supply air-insulated switchgears (IFB). Award(s) will be made to low responsive, responsible bidder(s); contract is for indefinite quantities. Electronic submission via Austin Finance Online eResponse is required; local/small business bid discounts apply in evaluation.
AvailableFairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
Posted Date
Dec 5, 2025
Due Date
Dec 22, 2025
Release: Dec 5, 2025
Close: Dec 22, 2025
Fairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis