Installation of chilled water piping and related infrastructure within the right of way to connect new customers. Work includes excavation, tunneling, dewatering, traffic control, and integration with existing systems.
Provision of labor, equipment, and services for maintenance, repair, replacement, and upgrades of large utility-size pumps for Austin Energy's power production facilities.
Procurement of all labor, tools, equipment, parts/materials, supervision, and incidentals necessary to replace condenser water pumps at Austin Energy's District Cooling Plant #2 (DCP2).
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Austin
County
The county where this buyer is located.
Travis
Address
Physical address of this buyer.
4815 Mueller Blvd.
Zip Code
Postal code for this buyer's location.
78723
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Austin Energy
Austin Energy Resource Plan 2035
Date: Apr 24, 2026Type: Strategic Plan
This document, a presentation by Austin Energy, outlines the utility's comprehensive strategy for electric service reliability. It introduces the Climate Generation and Protection to 2035 resource plan, which aims to meet Austin's increasing energy demands through an equitable transition to clean energy. Key priorities include reliability, affordability, environmental sustainability, and energy equity. The plan details strategies such as strengthening local generation capacity, increasing transmission, promoting customer solutions, and utilizing diverse energy sources, while also detailing the evaluation of locations for new energy infrastructure.
Austin Energy Stakeholder Meeting
Date: Jan 29, 2025Type: Meeting mention
The meeting focused on the Austin Energy Residential Solar Standard Offer program. Key topics included a safety review regarding parking lot awareness, a progress update on the commercial solar standard offer program, and the initiation of a stakeholder engagement plan for the potential residential solar program. Participants discussed opportunities for expanding residential solar adoption, the exploration of resiliency benefits and battery integration for solar systems, and the incorporation of learnings from the Solar for All grant program to ensure a viable and well-structured model for residential customers.
Key Contacts
Public-sector contacts connected to Austin Energy.
This document presents an update to the Austin Energy Resource Generation Plan, detailing strategies to achieve 100% carbon-free generation by 2030. The plan prioritizes balancing environmental sustainability, reliability, affordability, and cost stability. It addresses recent challenges such as extreme weather events, market volatility, and transmission congestion, while leveraging new legislative opportunities to promote carbon-free and renewable energy technologies.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Austin Energy meetings, strategic plans, and budget discussions before the public bid appears.