Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Clifton, Virginia is soliciting bids to construct a new utility duct bank to relocate overhead utilities along Main Street as part of the Town’s streetscape project. The federally funded project includes excavation, roadway work, drainage, water/sewer, curb and gutter, sidewalks, and related items.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The Town of Clifton, Virginia is soliciting bids to construct a new utility duct bank to relocate overhead utilities along Main Street as part of the Town’s streetscape project. The federally funded project includes excavation, roadway work, drainage, water/sewer, curb and gutter, sidewalks, and related items.
AvailablePremium
Access the largest public sector contact database
Include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx. 342 LF 36" jack and bore with 12-5" carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 LF of 12-5" open cut duct bank, 79 LF of 2-5" open cut duct bank, two 12'x12' manholes and typical erosion and sedimentation control and revegetation.
Posted Date
Jul 21, 2025
Due Date
Dec 18, 2025
Release: Jul 21, 2025
Close: Dec 18, 2025
Include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx. 342 LF 36" jack and bore with 12-5" carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 LF of 12-5" open cut duct bank, 79 LF of 2-5" open cut duct bank, two 12'x12' manholes and typical erosion and sedimentation control and revegetation.
AvailableLaunch complex (LC) 39 area power duct bank replacement.
Posted Date
Oct 27, 2025
Due Date
Dec 16, 2025
Release: Oct 27, 2025
Close: Dec 16, 2025
Launch complex (LC) 39 area power duct bank replacement.
AvailableProject consists of construction of a new duct bank for the purpose of relocating the existing utilities. The base bid is for all work related to construction of the project including all mobilization, demolition, earthwork, erosion control, excavation, backfill, roadway construction, drainage systems, water and sewer systems, curb, gutter, sidewalks, retaining walls, protection of existing utility systems, miscellaneous clearing and grubbing, stone installations, including clean up and all incidentals necessary for construction. See attached file.
Posted Date
Aug 12, 2025
Due Date
Dec 22, 2025
Release: Aug 12, 2025
Close: Dec 22, 2025
Project consists of construction of a new duct bank for the purpose of relocating the existing utilities. The base bid is for all work related to construction of the project including all mobilization, demolition, earthwork, erosion control, excavation, backfill, roadway construction, drainage systems, water and sewer systems, curb, gutter, sidewalks, retaining walls, protection of existing utility systems, miscellaneous clearing and grubbing, stone installations, including clean up and all incidentals necessary for construction. See attached file.