Retrieving RFP details
Release
Close
NASA Headquarters
Launch complex (lc) 39 area power duct bank replacement.
City of Bonita Springs
Work includes soccer complex fence replacement.
Kansas City Board of Public Utilities
Measure, design, build and ship a direct replacement bus duct to fit Quindaro CT2 combustion turbine.
City of Austin
Include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx. 342 LF 36" jack and bore with 12-5" carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 LF of 12-5" open cut duct bank, 79 LF of 2-5" open cut duct bank, two 12'x12' manholes and typical erosion and sedimentation control and revegetation.
Release
Oct 27, 2025
Close
Nov 12, 2025