Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx. 342 LF 36" jack and bore with 12-5" carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 LF of 12-5" open cut duct bank, 79 LF of 2-5" open cut duct bank, two 12'x12' manholes and typical erosion and sedimentation control and revegetation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Clifton, Virginia is soliciting bids to construct a new utility duct bank to relocate overhead utilities along Main Street as part of the Town’s streetscape project. The federally funded project includes excavation, roadway work, drainage, water/sewer, curb and gutter, sidewalks, and related items.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The Town of Clifton, Virginia is soliciting bids to construct a new utility duct bank to relocate overhead utilities along Main Street as part of the Town’s streetscape project. The federally funded project includes excavation, roadway work, drainage, water/sewer, curb and gutter, sidewalks, and related items.
AvailablePremium
Access the largest public sector contact database
Launch complex (LC) 39 area power duct bank replacement.
Posted Date
Oct 27, 2025
Due Date
Dec 16, 2025
Release: Oct 27, 2025
Close: Dec 16, 2025
Launch complex (LC) 39 area power duct bank replacement.
AvailableFairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
Posted Date
Dec 5, 2025
Due Date
Dec 22, 2025
Release: Dec 5, 2025
Close: Dec 22, 2025
Fairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
AvailableNetarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
Posted Date
Nov 13, 2025
Due Date
Jan 28, 2026
Release: Nov 13, 2025
Close: Jan 28, 2026
Netarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis