Alabama Department of Transportation
Special DistrictAL
Posted
Nov 19, 2026
Dec 4, 2026
Roadway Improvements (Widening, Resurfacing, Turn Lane Installation, Crossover Removal, and Traffic Stripe) on SR-210 (US-231/Ross Clark Circle) RFP
Work includes 775 SY removing concrete slope paving; 42 SY removing concrete flumes; 172 SY removing concrete driveway; 375 LF removing pipe; 657 LF removing curb; 10 EA removing headwalls; 4,265 CY unclassified excavation; 2,775 CY borrow excavation (loose truckbed measurement)(a4 or better); 58 CY structure excavation; 26 CY foundation backfill, commercial; 12,225 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness. See attached file.
