Intersection Improvements (IIP) - Sterling Boulevard & West Laurel Road
Work includes 153 CY regular excavation; 138 CY borrow excavation; 164 LF under-drain ud-2; 603 LF under-drain ud-4; 32 LF outlet pipe; 223 LF 15" conc. Pipe; 1 EA drop inlet di-3b,l=6'; 1 EA drop inlet di-3b,l=8'; 2 EA ns drop inlet di-3b,l=8' top only; 1 EA drop inlet di-3b,l=10' top only; 752 LF ns pipe existing pipe & SI structure to be cleaned; 3 EA connect to exist. A/c pipe; 299 ton asphalt concrete ty. Sm-9. 5a const; 174 LF asphalt concrete ty.Bm-25.0a const; 2,001 SY flexible pavement planing 0"-2"; 1,426 LF saw-cut asphalt concrete. See attached file.