Diamondhead Water And Sewer District
Special DistrictMS
Jul 29, 2026
Closes
Sep 10, 2026
Water Tower No. 1 Interior & Exterior Painting and Repairs RFP
Work includes paint the interior and exterior of the existing 500,000-gallon pedesphere style elevated water storage tank, cleaning, surface preparation, tank painting, site restoration, 8" overflow pipe repair, remove and replace the 16" gate valve, and furnishing of all equipment required to complete, test, and make ready for use by the owner all structures, equipment, and systems.