Omaha Metropolitan Utilities District
Special DistrictNE
Posted
Oct 27, 2026
Nov 10, 2026
Install Water Mains Woodland Lots 1-129 & Outlots "A" - "E" SW of S 192nd ST & Giles Rd RFP
Work includes 420 LF 12 inch dipj pipe, 2130 LF 8 inch dipj pipe, 620 LF 8 inch hdpe pipe (dr11), 6 EA tees with 8" throughway, 7 EA furnish and install adjustable valve box and valve; install 8" gate valve, 13 EA type 1 hydrant: furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant; install valve and hydrant for a type 1 hydrant, (standard). See outside link.
