CitySC
Posted
-
Dec 3, 2026
Highway 905 Water Line Upgrade RFP
Construction of approximately 3,000 linear feet of 12-inch PVC water line, 1,250 linear feet of 14-inch HDPE directionally drilled water line, four fire hydrant assemblies, and reconnections to 38 existing water services along Highway 905.
