Rhode Island Public Transit Authority
State AgencyRI
Posted
Aug 3, 2026
Sep 7, 2026
Description: On SAM.gov, NAVFACSYSCOM MID-ATLANTIC issued this combined synopsis/solicitation to procure construction services for inspecting and testing electric and diesel fire pumps, engines, controllers, and an oil/water separator at Building R38 supporting Naval Weapons Station Earle. The services are to be performed at Colts Neck, New Jersey, with a mandatory 60-calendar-day performance period beginning within 15 calendar days after Notice to Proceed. SAM.gov lists the original publication as Sep 02, 2026 08:40 am EDT and offers due as Oct 07, 2026 11:00 am EDT; it shows the opportunity as Active on 2026-09-03 and identifies it as a contract opportunity rather than a grant.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from NAVFAC Mid-Atlantic.
Adjacent opportunities open for bidding right now.
Rhode Island Public Transit Authority
State AgencyRI
Posted
Aug 3, 2026
Sep 7, 2026
Oil water separator construction. Work includes removal of two underground oil water separators, concrete slab work, installation of a new above ground oil water separator system, a new sump with redundant pneumatic pumps, monitoring system, protective bollards, piping for wastewater and compressed air, and commissioning of new system.
University Of Washington Seattle Campus
Higher EducationWA
Posted
Aug 12, 2026
Sep 9, 2026
The project includes the following work: Installation of a new Striem OT-1,000 underground oil-water separator serving the University of Washington Fleet Services Car Wash facility. Work includes, but is not limited to, selective demolition of the existing concrete slab within the car wash, removal and replacement of exterior asphalt pavement, installation of new 6-inch sanitary sewer piping, storm drainage improvements including catch basins, installation of the oil-water separator, and associated pavement striping and signage. The work also includes temporary erosion and sediment control measures, temporary dewatering as required, and all associated restoration necessary to complete the improvements.
FederalDC
Posted
Aug 25, 2026
Sep 7, 2026
The active Combined Synopsis/Solicitation, Notice ID W912PB26QA115, seeks REPAIR AND GENERAL INSPECTION OF POL SEPARATOR, BLDG. # 2206, USAG BAVARIA, ROSE BARRACKS. The work will be performed at USAG Rose Barracks and concerns repair and general inspection of the POL separator in Building 2206. The solicitation was posted on August 25, 2026, and offers are due September 7, 2026, at 8:00 a.m. EDT.
CitySC
Posted
Jul 27, 2026
Sep 1, 2027
The City of Myrtle Beach seeks proposals for a term contract covering inspection, testing, and repair services for fire protection systems at various city facilities, including fire alarm and detection, fire sprinkler, and fire pump systems. A mandatory pre-proposal meeting is scheduled for August 18, 2026, at 10:00 AM Eastern at the City of Myrtle Beach Procurement Office, and attendance is required for proposal consideration. This is a procurement solicitation—not a grant—and proposals are due September 1, 2027, at 2:00 PM Eastern.