Fox River Water Reclamation District
Special DistrictIL
Jul 1, 2026
Closes
Aug 14, 2026
ADP WRF Bar Screen Installation
The Project consists of equipment removal; concrete modifications to two existing influent channels for the installation of mechanical bar screening equipment; construction of a new concrete operation deck and staircase; installation of mechanical bar screening equipment and washer compactor equipment; installation of a prefabricated building; and installation of all ancillary electrical and controls to properly operate the proposed equipment.