Missouri Department of Transportation
State AgencyMO
Jul 6, 2026
Closes
Oct 30, 2026
Description: Work inlcudes repair, installation, removal, or removal and installation of a total of 133 regulatory waterway markers.
StateAgency · FL, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Florida Fish and Wildlife Conservation Commission.
Adjacent opportunities open for bidding right now.
Missouri Department of Transportation
State AgencyMO
Jul 6, 2026
Closes
Oct 30, 2026
Procurement for the replacement of Bridge No. L0568 with a new MO 291 Missouri River crossing including a multi-use path, and the long-term rehabilitation of Bridge No. A4757.
CityIA
Aug 12, 2026
Closes
Sep 3, 2026
The proposed improvements include, but are not limited to the construction of new roadway, reconstruction of the existing roadway, ADA sidewalk and ramps, integrated curb installation and replacement, resetting of all existing utility surface features to finish grade, replacement of driveway approach aprons, topsoil, sodding, and erosion control. Bid items: 85 CY topsoil, offsite; 1,280 SY of 6" subbase, modified; 4 LF of 15" storm sewer, trenched, RCP; 1 Ea of 60" dia. manhole, SW-401; 125 SF of 6" sidewalk, PCC; 16.5 SF traffic signs. See attached file.
Jul 23, 2026
Closes
Aug 24, 2026
The active solicitation concerns Barataria Bay Waterway Maintenance Dredging (Non-Continuous) in Jefferson Parish, Louisiana, under notice W912P826BA073. The work consists of removing dredged material from the waterway and disposing of it at the designated disposal area. It is a federal procurement by the U.S. Army Corps of Engineers, New Orleans District, rather than a grant program; no primary solicitation file was available in the retrieved official record.
CityKY
Aug 12, 2026
Closes
Sep 3, 2026
Tap river sidewalk work type: sidewalk construction.