Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Romeo Community Schools is soliciting proposals for improvements to two playground sites (Indian Hills and Hevel Elementary) including site preparation, new playground equipment, safety surfacing, landscaping, and related infrastructure upgrades. A mandatory pre-bid/site tour is scheduled for January 15, 2026, and proposals are due January 28, 2026. The opportunity is a competitive RFP for construction/site work (not a grant) and is listed on the State of Michigan SIGMA/Advantage4 portal as the official source.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional services for the installation of site improvements associated with a new playground.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Provide professional services for the installation of site improvements associated with a new playground.
AvailableDesign, supply, and installation of playground site improvements at Carroll Park.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Design, supply, and installation of playground site improvements at Carroll Park.
AvailableProject includes 9,968 SF demolition of concrete paving (walkways and pads), 11,585 SF demolition of playground sand, 1 LS relocate existing storm drains, 15,000 CY earthwork / rough grading, 90,000 SF clearing and grubbing, 22,968 SF provide, grade, and compact class II sub base, 240 LF 12" wide concrete play area perimeter bond beam, 1 LS 28 playground equipment, 10,402 SF poured-in-place resilient rubber surfacing, 1 LS site lighting, see attached file.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Project includes 9,968 SF demolition of concrete paving (walkways and pads), 11,585 SF demolition of playground sand, 1 LS relocate existing storm drains, 15,000 CY earthwork / rough grading, 90,000 SF clearing and grubbing, 22,968 SF provide, grade, and compact class II sub base, 240 LF 12" wide concrete play area perimeter bond beam, 1 LS 28 playground equipment, 10,402 SF poured-in-place resilient rubber surfacing, 1 LS site lighting, see attached file.
Rooftop HVAC unit upgrades for Ramapo High School and Indian Hills High School.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Rooftop HVAC unit upgrades for Ramapo High School and Indian Hills High School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis