CityLA
Posted
-
Nov 24, 2026
Julia Street Improvements RFP
Project consists of engineering & construction for milling, base construction, and overlaying the existing city street for its entire length. 201 SY removal of asphalt drives; 122 LF removal of concrete combination curb & gutter; 954 SY removal of concrete walks and drives; 517 SY removal of incidental concrete paving; 105 LF cleaning existing ditches; 334.5 TN asphalt concrete. See attached file.
