Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement and installation of existing internally illuminated street name signs with edge-lit LED street name signs at key locations throughout the city.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide street dual pedestrian bridge replacement project.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Provide street dual pedestrian bridge replacement project.
AvailableWalker County Board of Commissioners requests sealed bids for the Ivy Street Culvert Replacement project to replace failed stormwater infrastructure at the intersection of Ivy Street and Highway 27; work includes construction of approximately 150 linear feet of culverts and accounts for heavy truck loading in design. Bidders must obtain Contract Documents, Specifications, and Drawings from the Engineer (CTI Engineers, Inc.) for $100 and be listed on the engineer's planholder list. Bids are due February 19, 2026 at 2:00 PM local time and will be publicly opened at the Walker County Board of Commissioners Office.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Walker County Board of Commissioners requests sealed bids for the Ivy Street Culvert Replacement project to replace failed stormwater infrastructure at the intersection of Ivy Street and Highway 27; work includes construction of approximately 150 linear feet of culverts and accounts for heavy truck loading in design. Bidders must obtain Contract Documents, Specifications, and Drawings from the Engineer (CTI Engineers, Inc.) for $100 and be listed on the engineer's planholder list. Bids are due February 19, 2026 at 2:00 PM local time and will be publicly opened at the Walker County Board of Commissioners Office.
AvailableProject consists of roof replacement.
Posted Date
-
Due Date
Mar 16, 2026
Close: Mar 16, 2026
Project consists of roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →