Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx. 928 LF of 8" sanitary sewer forcemain within TxDOT right-of-way (ROW). Connecting to an existing force main system for the utilities department. The work includes. but is not limited to: Approx. 515 LF of jack-and-bore or tunnel installation of an 8" sewer line within a 16" steel casing. Approx. 413 LF of open-cut installation of 8" PVC forcemain Surge protection, filling. capping. and abandonment of existing sanitary sewer pipe and manhole structures as necessary. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
RFP for Water Main Relocation services.
Posted Date
Dec 29, 2025
Due Date
Jan 23, 2026
Release: Dec 29, 2025
Close: Jan 23, 2026
RFP for Water Main Relocation services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction engineering and inspection (CEI) services for the IH-35 capital express central - downtown (advance construction) project.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Provide construction engineering and inspection (CEI) services for the IH-35 capital express central - downtown (advance construction) project.
AvailableProvide construction engineering and inspection (CEI) services for the IH-35 capital express central - university (advance construction) project.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Provide construction engineering and inspection (CEI) services for the IH-35 capital express central - university (advance construction) project.
AvailablePerform the installation of approx. 2,475 LF of 8"" PVC and HDPE FM by direct bury and horizontal directional drill, but not limited to, FM interconnections, MOT, asphalt pavement restoration, sodding and project videotaping).
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Perform the installation of approx. 2,475 LF of 8"" PVC and HDPE FM by direct bury and horizontal directional drill, but not limited to, FM interconnections, MOT, asphalt pavement restoration, sodding and project videotaping).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →