Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform the installation of approx. 2,475 LF of 8"" PVC and HDPE FM by direct bury and horizontal directional drill, but not limited to, FM interconnections, MOT, asphalt pavement restoration, sodding and project videotaping).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes installation of approx. 928 LF of 8" sanitary sewer forcemain within TxDOT right-of-way (ROW). Connecting to an existing force main system for the utilities department. The work includes. but is not limited to: Approx. 515 LF of jack-and-bore or tunnel installation of an 8" sewer line within a 16" steel casing. Approx. 413 LF of open-cut installation of 8" PVC forcemain Surge protection, filling. capping. and abandonment of existing sanitary sewer pipe and manhole structures as necessary. See outside link.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Work includes installation of approx. 928 LF of 8" sanitary sewer forcemain within TxDOT right-of-way (ROW). Connecting to an existing force main system for the utilities department. The work includes. but is not limited to: Approx. 515 LF of jack-and-bore or tunnel installation of an 8" sewer line within a 16" steel casing. Approx. 413 LF of open-cut installation of 8" PVC forcemain Surge protection, filling. capping. and abandonment of existing sanitary sewer pipe and manhole structures as necessary. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for Water Main Relocation services.
Posted Date
Dec 29, 2025
Due Date
Jan 23, 2026
Release: Dec 29, 2025
Close: Jan 23, 2026
RFP for Water Main Relocation services.
AvailableReplacement of the relocation of the force main; associated site work and restoration; installation of E&S controls; and associated work
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Replacement of the relocation of the force main; associated site work and restoration; installation of E&S controls; and associated work
AvailableThe Project includes the following Work: The installation of approximately 1,460 linear feet of 10 inch diameter PVC force main along US Highway 51. The project also consists of an asphalt roadway patch on Exchange Street, erosion control, and restoration along US Highway 51.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
The Project includes the following Work: The installation of approximately 1,460 linear feet of 10 inch diameter PVC force main along US Highway 51. The project also consists of an asphalt roadway patch on Exchange Street, erosion control, and restoration along US Highway 51.