Higher EducationVA
Jul 28, 2026
Closes
Sep 1, 2026
IFB-125215 IFB Improve Campus Utilities Infrastructure - Electrical
Radford University is soliciting bids for installation of a 13-section 4.16 kV main-tie-main switchgear lineup in an outdoor protected-aisle enclosure on a cable vault. The work includes underground ductbank construction, feeder-cable installation from the RED substation and CHP, distribution-feeder installation, phased reconfiguration of existing feeders, and modifications to the RED substation. The procurement is an Invitation for Bids for non-professional, non-technology services and requires bidders to consult the solicitation documents for mandatory pre-bid or site-visit requirements and public-opening information.