CityFL
Posted
Aug 31, 2026
Oct 14, 2026
MM Annual Lab Analyses RFP
Seeking bid for annual lab analyses.
Description: Work includes selected clearing, traffic control, permanent construction signs (ground mounted) 452. 000 sf, median cable barrier 21,806. 000 lf, cable barrier end anchor 20. 000 ea, woven wire fence - type 1 with 2 strands barbed 237,600. 000 lf, permanent grassing for small projects 5. 000 acre, stabilized construction entrance 8,250. 000 sy.
StateAgency · SC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Posted
Aug 31, 2026
Oct 14, 2026
Seeking bid for annual lab analyses.
South Carolina Department of Transportation
State AgencySC
Posted
Sep 8, 2026
Oct 13, 2026
Work includes liquid asphalt binder pg64-22 1,238.250 Ton, liquid asphalt binder pg76-22 3,933.207 Ton, surface plane asphalt pavement - variable 228,600.000 SY, surface plane asphalt pavement 1.5" 454,490.688 SY, milling existing asphalt pavement 2.0" 651,575.375 SY, asphalt surface course type a 15,240.000 Ton, asphalt surface course type e 19,050.000 Ton, stone matrix asphalt surface course - 9.5 mm 49,919.465 Ton, traffic control, permanent construction signs (ground mounted) 940.000 SF, construction zone electric changeable message sign trailer 2.000 EA. See attached file.
Pennsylvania Department of Transportation
State AgencyPA
Posted
-
Oct 22, 2026
For the improvement of approx. 9.86 miles of existing separated limited access highway involving liquid asphalt patching (hot pour mastic), milling of asphalt pavement, superpave asphalt mixture design for binder course and polymer-modified emulsified (micro surfacing) applications, pavement markings, and miscellaneous construction.
Idaho Transportation Department
State AgencyID
Posted
Oct 9, 2026
Oct 27, 2026
Adding PTZ cameras, including fiber communication for cameras, and hardwiring flashing beacons on both sides of 4th of July pass on I-90. Work will also include replacing illumination conduit and junction boxes for I-90 EB chain-up area
Decision makers connected to this RFP from South Carolina Department of Transportation.