Open RFP

I-78 - SR 412 to Readington Bridge

Description: PennDOT will replace deteriorated concrete pavement slabs along about two miles of westbound I-78 between the Easton Road and Redington Road bridges in Lower Saucon Township. The work includes guide-rail end-treatment and pavement-base-drain upgrades, drainage-pipe work, reconstruction and widening to extend acceleration lanes at the SR 412 entrance ramps for both directions of I-78. It also includes modifications to the eastbound bridge shoulder with strip-seal joint replacement and a PPC overlay, and rehabilitation of an existing stormwater basin near Easton Road.

Released
Nov 4, 2026
Closes
Dec 3, 2026(26 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts