Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of 1 LS bridge removal work; 25 SY class 2 preparation; 468 SY ppc removal; 12 CY furnish premixed polymer concrete; 468 SY construct ppc overlay; 1 LS precompressed foam silicone joint seal; 1 LS precompressed foam silicone joint seal; 1 LS modular bridge joint systems; 1 LS pressure washing; 36 ea support bar repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation of Bridge No 307 - Gravel Pit Road Over East Fork Whitewater River.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Rehabilitation of Bridge No 307 - Gravel Pit Road Over East Fork Whitewater River.
AvailableThis is an Invitation for Bid from the Connecticut Department of Transportation to rehabilitate the Putnam Memorial Bridge (Bridge No. 00417) carrying Route 3 over the Connecticut River. The solicitation lists an open date of 2025-11-12 and a close date of 2026-01-07; the buyer's WebProcure posting requires login and the official solicitation documents were not publicly accessible.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
This is an Invitation for Bid from the Connecticut Department of Transportation to rehabilitate the Putnam Memorial Bridge (Bridge No. 00417) carrying Route 3 over the Connecticut River. The solicitation lists an open date of 2025-11-12 and a close date of 2026-01-07; the buyer's WebProcure posting requires login and the official solicitation documents were not publicly accessible.
AvailableWork includes 228 LF of cofferdam and dewatering; 40 CY of compacted granular fill; 13 SF of 1/2" preformed expansion joint filler; 65 TN of hma; 333 LF of joint and crack sealing in bituminous concrete pavement; 64 LF of sawing and sealing joints; 532 SY of removal of existing wearing surfaces; 1 LS of removal of superstructure; 132 CY of bridge deck concrete (sip form); 320 LF of parapet concrete; 48 CY of approach slab concrete; 31 CY of intermediate riprap; 567 SY of membrane waterproofing (cols liquid elastomeric); etc, see attached file.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Work includes 228 LF of cofferdam and dewatering; 40 CY of compacted granular fill; 13 SF of 1/2" preformed expansion joint filler; 65 TN of hma; 333 LF of joint and crack sealing in bituminous concrete pavement; 64 LF of sawing and sealing joints; 532 SY of removal of existing wearing surfaces; 1 LS of removal of superstructure; 132 CY of bridge deck concrete (sip form); 320 LF of parapet concrete; 48 CY of approach slab concrete; 31 CY of intermediate riprap; 567 SY of membrane waterproofing (cols liquid elastomeric); etc, see attached file.
Release: Dec 8, 2025
Close: Jan 20, 2026
Work includes bridge rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis