Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is an Invitation for Bid from the Connecticut Department of Transportation to rehabilitate the Putnam Memorial Bridge (Bridge No. 00417) carrying Route 3 over the Connecticut River. The solicitation lists an open date of 2025-11-12 and a close date of 2026-01-07; the buyer's WebProcure posting requires login and the official solicitation documents were not publicly accessible.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 930 LF cut bituminous concrete pavement; 365 SY anit-tracking pad; 4,169 LF sedimentation control system; 14 EA sediment control system at catch basin; 128 LF joint and crack sealing of bituminous concrete pavement; 992 GAL non-tracking asphalt track coat; 14,045 LF 80 mil pavement marking groove 7" wide; 2,278 LF 80 mil pavement parking 13" wide; 1,647 TN material transfer vehicle. See attached file.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
Work includes 930 LF cut bituminous concrete pavement; 365 SY anit-tracking pad; 4,169 LF sedimentation control system; 14 EA sediment control system at catch basin; 128 LF joint and crack sealing of bituminous concrete pavement; 992 GAL non-tracking asphalt track coat; 14,045 LF 80 mil pavement marking groove 7" wide; 2,278 LF 80 mil pavement parking 13" wide; 1,647 TN material transfer vehicle. See attached file.
Premium
Access the largest public sector contact database
This project will replace the existing bridge on Route 17 northbound over Dragon Run. During construction, the bridge over Dragon Run on Route 17 northbound would be closed. Northbound traffic would be diverted to cross the Route 17 southbound bridge over Dragon Run, with a single northbound and southbound travel lane sharing the southbound bridge. VDOT is replacing the existing bridge to improve the condition of the northbound Dragon Run crossing. The new bridge will be raised to an elevation similar to the Route 17 southbound bridge over Dragon Run.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
This project will replace the existing bridge on Route 17 northbound over Dragon Run. During construction, the bridge over Dragon Run on Route 17 northbound would be closed. Northbound traffic would be diverted to cross the Route 17 southbound bridge over Dragon Run, with a single northbound and southbound travel lane sharing the southbound bridge. VDOT is replacing the existing bridge to improve the condition of the northbound Dragon Run crossing. The new bridge will be raised to an elevation similar to the Route 17 southbound bridge over Dragon Run.
The Illinois Department of Transportation is soliciting bids for bridge painting and repair of structure SN 063-0002 (Scott W. Lucas Memorial Bridge) over the Illinois River in Fulton County. The solicitation is part of the January 16, 2026 letting and includes requirements for SSPC-QP1 and QP2 certified contractors, with a completion date of September 1, 2027 plus 10 working days. Plans and special provisions have not yet been posted at the time of this notice.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation is soliciting bids for bridge painting and repair of structure SN 063-0002 (Scott W. Lucas Memorial Bridge) over the Illinois River in Fulton County. The solicitation is part of the January 16, 2026 letting and includes requirements for SSPC-QP1 and QP2 certified contractors, with a completion date of September 1, 2027 plus 10 working days. Plans and special provisions have not yet been posted at the time of this notice.
AvailableRelease: Dec 8, 2025
Close: Jan 20, 2026
Work includes bridge rehabilitation.