Summary
Work includes rehabilitate the river bridge including deck replacement and polymer overlay. This project consists of removal and disposal items, stone backfill, trenching and shoulder preparation, aggregate base course, Portland cement concrete base, ACHM surface course, cold milling asphalt pavement, ACHM patching of existing roadway, approach slabs and gutters, Portland cement concrete pavement patching, maintenance of traffic, guardrail, geotextile fabric, traffic signal items, modification of existing bridge structure, steel repair, lightweight concrete, bridge jacking, and misc. items. Also includes 32 SY of removal and disposal of concrete pavement; 513 gal. of tack coat.