Perform a comprehensive wetland restoration and site stabilization. The scope of work for this project encompasses comprehensive wetland restoration and site stabilization activities at the Wildlife Management Area. The contractor will execute sediment removal across several designated wetland basins to restore original holding capacities and ecological function. Initial site preparation will include extensive woody removal, consisting of clearing and grubbing targeting invasive or overgrown vegetation. To manage subsurface hydrology, a thorough drainage tile investigation will be conducted, followed by the strategic removal of identified tiles. Following the primary earthwork
and excavation, the contractor will cultivate all disturbed areas within the construction site boundary to prepare the soil matrix. Final site stabilization will be achieved by sowing specified seed mixes and applying mulch across all disturbed areas onsite to prevent erosion and promote vegetative establishment.
The term of this contract is anticipated to be from May 03, 2027, to August 20, 2027. See attached files.