Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work also consists of relocating six (6) water services to connect directly to an existing 16" ductile iron water main located on the south‐bound lane of Riverside Drive.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for water main replacement of approximately 610 linear feet of existing 6-inch cast iron water main with an 8-inch ductile iron water main.
Posted Date
-
Due Date
Apr 1, 2026
Release: -
Close: Apr 1, 2026
Procurement for water main replacement of approximately 610 linear feet of existing 6-inch cast iron water main with an 8-inch ductile iron water main.
AvailableWork consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 11, 2026
Release: Dec 23, 2025
Close: Feb 11, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
AvailableReplacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
Posted Date
-
Due Date
Mar 19, 2026
Release: -
Close: Mar 19, 2026
Replacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
AvailableThe project includes but is not limited to replacement of approx. 2,000 LF of existing 6" water main on W. 78th Avenue with new 6" water main from Hendricks Street to Taney Place. The work also includes replacement of valves, hydrants, and water services within the Right of Way.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The project includes but is not limited to replacement of approx. 2,000 LF of existing 6" water main on W. 78th Avenue with new 6" water main from Hendricks Street to Taney Place. The work also includes replacement of valves, hydrants, and water services within the Right of Way.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →