Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hayward is soliciting sealed proposals for Project 26-022: HSIP - Pedestrian Crossing Upgrades on Minor Arterials Project PS&E to produce Plans, Specifications, and Estimates (PS&E) for pedestrian crossing safety upgrades. The consultant will provide full project design deliverables (30/60/90/100% PS&E), survey/data collection, project management, and compliance with applicable laws and prevailing wage requirements. Proposals must be submitted through the City’s eProcurement portal and the contract is expected to be complete by January 23, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Close: Jan 19, 2026
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
AvailableTown of Sandwich (Engineering Department) issued an open market solicitation for Pedestrian Crossing Improvements with an estimated value range of $1,000,000–$5,000,000. Specifications and bid forms are available starting 2025-12-24 via BidExpress, and bidders are instructed NOT to submit quotes via COMMBUYS. The solicitation is open with a bid opening on 2026-01-14 and requires submission through the buyer-specified channel.
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
Town of Sandwich (Engineering Department) issued an open market solicitation for Pedestrian Crossing Improvements with an estimated value range of $1,000,000–$5,000,000. Specifications and bid forms are available starting 2025-12-24 via BidExpress, and bidders are instructed NOT to submit quotes via COMMBUYS. The solicitation is open with a bid opening on 2026-01-14 and requires submission through the buyer-specified channel.
Procurement for the installation of accessible pedestrian signals at existing signalized intersections, including minor pavement marking and flatwork.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Procurement for the installation of accessible pedestrian signals at existing signalized intersections, including minor pavement marking and flatwork.
AvailableWork includes required submittals and meetings as required for permits, mobilization, temp site controls, demolition, grubbing and site grading, new concrete and asphalt pavement surfaces, new contractor-designed pre-manufactured pedestrian bridge and stair/elevator towers, new landscaping elements and irrigation systems, new elevator system, new lighting and electrical service, and demobilization.
Posted Date
Nov 4, 2025
Due Date
Jan 6, 2026
Release: Nov 4, 2025
Close: Jan 6, 2026
Work includes required submittals and meetings as required for permits, mobilization, temp site controls, demolition, grubbing and site grading, new concrete and asphalt pavement surfaces, new contractor-designed pre-manufactured pedestrian bridge and stair/elevator towers, new landscaping elements and irrigation systems, new elevator system, new lighting and electrical service, and demobilization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis