Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control and public services coordination required for the completion of the project. The proposed improvements include clearing and grubbing, cold milling of existing asphalt pavement, construction of Portland cement concrete pavement, construction of asphalt pavement, reconstruction of curb ramps, construction of raised crosswalks, installation of flashing beacons, including rectangular rapid flashing beacons (RRFB), installation of LED lighting, including poles, foundations pull boxes, and conduit, installation of pavement striping and markings, traffic signage, and installation of fencing and pavers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1 LS traffic control & construction signage; 34 CY roadway excavation; 12,117 LF remove pavement striping; 1,584 SY remove thermoplastic pavement marking; 43 ton hot mix asphalt (type a); 908 SF minor concrete - median flatwork - 8" pcc; 833 LF minor concrete - 8" median curb; 56 EA remove roadside sign; 40 EA remove post and foundation for roadside sign; 75 EA install relocated roadside sign; 76 EA install roadside sign; 2,096 LF thermoplastic traffic stripe (detail 8); 3,759 LF thermoplastic traffic stripe (detail 22); 233 LF thermoplastic traffic stripe (detail 28). See outside link.
Posted Date
Dec 16, 2025
Due Date
Feb 3, 2026
Release: Dec 16, 2025
Close: Feb 3, 2026
Work includes 1 LS traffic control & construction signage; 34 CY roadway excavation; 12,117 LF remove pavement striping; 1,584 SY remove thermoplastic pavement marking; 43 ton hot mix asphalt (type a); 908 SF minor concrete - median flatwork - 8" pcc; 833 LF minor concrete - 8" median curb; 56 EA remove roadside sign; 40 EA remove post and foundation for roadside sign; 75 EA install relocated roadside sign; 76 EA install roadside sign; 2,096 LF thermoplastic traffic stripe (detail 8); 3,759 LF thermoplastic traffic stripe (detail 22); 233 LF thermoplastic traffic stripe (detail 28). See outside link.
AvailableThe City of Hayward is soliciting sealed proposals for Project 26-022: HSIP - Pedestrian Crossing Upgrades on Minor Arterials Project PS&E to produce Plans, Specifications, and Estimates (PS&E) for pedestrian crossing safety upgrades. The consultant will provide full project design deliverables (30/60/90/100% PS&E), survey/data collection, project management, and compliance with applicable laws and prevailing wage requirements. Proposals must be submitted through the City’s eProcurement portal and the contract is expected to be complete by January 23, 2026.
Posted Date
Dec 18, 2025
Due Date
Jan 24, 2026
Release: Dec 18, 2025
Close: Jan 24, 2026
The City of Hayward is soliciting sealed proposals for Project 26-022: HSIP - Pedestrian Crossing Upgrades on Minor Arterials Project PS&E to produce Plans, Specifications, and Estimates (PS&E) for pedestrian crossing safety upgrades. The consultant will provide full project design deliverables (30/60/90/100% PS&E), survey/data collection, project management, and compliance with applicable laws and prevailing wage requirements. Proposals must be submitted through the City’s eProcurement portal and the contract is expected to be complete by January 23, 2026.
Project consists of intersection improvement to construct a roundabout.
Posted Date
Jan 1, 2026
Due Date
Jan 22, 2026
Release: Jan 1, 2026
Close: Jan 22, 2026
Project consists of intersection improvement to construct a roundabout.
AvailableWork includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
Posted Date
Oct 10, 2025
Due Date
Jan 30, 2026
Release: Oct 10, 2025
Close: Jan 30, 2026
Work includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis