College Park Housing Authority
Special DistrictMD
Posted
Sep 2, 2026
Oct 1, 2026
Housing Authority Roof Replacement (Request for proposal)
To provide services for the installation of a roof replacement project.
Description: To replace the first-floor hydronic heating recirculation piping.
SpecialDistrict · MD, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
College Park Housing Authority
Special DistrictMD
Posted
Sep 2, 2026
Oct 1, 2026
To provide services for the installation of a roof replacement project.
CityNJ
Posted
Aug 31, 2026
Oct 22, 2026
Accounting Services – Housing Authority.
Minneapolis Community And Technical College
Higher EducationMN
Posted
Aug 14, 2026
Sep 14, 2026
A/E to assist the owner in the performance of its obligations and enforcement of its rights during the design and construction of the heating plant fuel tank replacement. The project involves the removal of the three existing buried 30,000-gallon fuel oil tanks, fuel oil pumps/piping distribution systems, and controllers that serve the main heating plant. The existing fuel oil system will be "right-sized" and replaced with one new aboveground 40,000-gallon fuel tank, one new 4,000-gallon aboveground fuel oil tank, new pumps/piping distribution, controllers and related electrical power distribution. The project also includes a new aboveground 4,000-gallon fuel oil tank located at the north end of the plant and dedicated to serving the plant emergency generator.
Kansas Department of Administration
State AgencyKS
Posted
Aug 19, 2026
Sep 23, 2026
Provide the removal and replacement of hydronic piping serving one floor. Work includes but are not limited to - deliver all required contractor-provided tools and equipment to the jobsite. Perform lockout/tagout (loto) procedures for applicable electrical services. Remove all existing hydronic piping. Properly remove and dispose of existing piping and associated materials generated by the contractor's work. Install facility-provided type A PEX piping, fittings, specialties, and associated components. Provide and install additional pipe hangers and supports as necessary to meet applicable minimum requirements. Coordinate with wcf facility staff and designated vendors regarding the sealing and insulation of all new piping. See attached file.