CityCT
Aug 6, 2026
Closes
Sep 10, 2026
Holly Hill Area Sewer and Manhole Rehabilitation RFP
Work inlcudes 270 LF furnish and install 6" to 8" cured-in- place pipe liner of existing sewer including cleaning, television inspection, pipeline preparation, and bypass pumping; 1,200 LF furnish and install 12" cured-in-place pipe liner of existing sewer including cleaning, television inspection, pipeline preparation, and bypass pumping; 2,090 LF furnish and install 18" cured-in-place pipe liner of existing sewer including cleaning, television inspection, pipeline preparation, and bypass pumping. See attached file.