Meadow Creek Valley Trail RFP
Work includes 950 CY regular excavation; 682 CY structure excavation; 54 LF 24" dia. Drilled shaft; 20 LF saw cut curb, gutter and entrances; 25 SY remove sidewalk and entrance; 2 EA construction entrance; 3,808 LF temporary silt fence; 1 LS construction signage; 4,008 LF tree protection fencing; 1 LS temporary vehicular stream crossing; 86 ton cover matl. fine aggr. No. 10 (stone dust); 75 ton asphalt concrete sm-9. 5a; 2,898 sf boardwalk timber framing; 1,410 LF boardwalk micropile foundation (helical piers); 1 LS bridge 2 superstructure prefabricated steel truss (delivered); 1 LS bridge 1 superstructure prefabricated steel truss (delivered). See attached file.