Special DistrictNY
Jul 29, 2026
Closes
Sep 18, 2026
Main Street Entrance Replacement (Request for Proposal)
Provide complete removal and replacement of pedestrian entrance.
Description: Work includes remove and replace all existing pivots and thresholds located on three (3) pairs of main entry and exit doors.
City · FL, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of St. Petersburg.
These related opportunities are still open for bidding.
Special DistrictNY
Jul 29, 2026
Closes
Sep 18, 2026
Provide complete removal and replacement of pedestrian entrance.
FederalOH
Aug 6, 2026
Closes
Aug 17, 2026
Provide Arm Assembly,pivot,tra, NSN 2530012228006, Qty 38 UI Ea
W7NH USPFO Activity Msang CRTC
FederalMS
Aug 10, 2026
Closes
Aug 19, 2026
Twin XL mattresses – Qty 110: Twin XL mattress must be 38"x 80"; Mattress thickness is preferred to be no less than 11"; Mattress should have a foam frame of not less than 3.75"; Mattress must have at least 312 inner coil springs made of at least 13-gauge wire; Mattress must be fully encased in a nylon ticking which must be bacterial/fungal and fire resistant; Mattress must be double-sided/reversible; Mattress must have at least an industry standard warranty. See attached file.
Food Safety and Inspection Service
FederalDC
Aug 13, 2026
Closes
Aug 31, 2026
Phase I: Safety Isolation & Refrigerant Recovery: Lockout/Tagout (LOTO): Isolate all electrical power sources to Chiller 1 in compliance with OSHA safety protocols to ensure a zero-energy state. Refrigerant Recovery: Connect an EPA-certified recovery unit to Circuit 2. Recover all remaining R410A refrigerant into clean, certified recovery cylinders. Document the total weight of the recovered gas. Phase II: Component Demolition & Installation: Coil Demolition: Unbraze and unbolt the leaking condenser coil. Properly rig, lift, and remove the damaged section from the chiller frame. See attached file.