CityWI
Aug 5, 2026
Closes
Sep 14, 2026
Highpoint Road Asphalt Paving Project
Work includes approx 2,246 TN asphalt mix or greater compacted in two lifts 3", to construct a 22' finished roadway (11' each lane); 282 TN load, haul and compact 3/4" CABC shoulder gravel on roadway 1' wide; 1 Ls fine grade, shape water and compact roadway 24' wide.