Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Federal Highway Administration (CFLHD) issued a pre‑solicitation to gauge contractor interest for construction improvements to multiple bridges along Hāna Highway (SR‑360) near Hāna, Maui, HI, emphasizing accelerated bridge construction and multiphase traffic control methods. The notice requests statements of interest, bonding capability documentation (single project bond requirement $45 M), project experience, and a choice of source selection methodology, seeking input from small business categories to determine set‑aside feasibility. Responses are due January 13 2026 (2 p.m. Denver time) and should be submitted to CFLAcquisitions@dot.gov.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is a Sources Sought notice issued by the Central Federal Lands Highway Division to determine interest and capabilities for bridge replacement/improvement work on six bridges along State Route 360 (Hana Highway) on Maui, HI. The work includes replacement of six bridges meeting modern loading, seismic, and railing standards while preserving historic character, with construction expected to begin in August 2026 and finish by November 2029. Advertisement is anticipated in May 2026, with award in July 2026 and an estimated cost range of $35M‑$45M.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
This is a Sources Sought notice issued by the Central Federal Lands Highway Division to determine interest and capabilities for bridge replacement/improvement work on six bridges along State Route 360 (Hana Highway) on Maui, HI. The work includes replacement of six bridges meeting modern loading, seismic, and railing standards while preserving historic character, with construction expected to begin in August 2026 and finish by November 2029. Advertisement is anticipated in May 2026, with award in July 2026 and an estimated cost range of $35M‑$45M.
Available200 CY of Removal of Stone Masonry, 1,800 CY of Roadway Excavation, 1,620 CY of Structure Excavation, 1,100 CY of Structural Backfill, 1,140 ton of Roadway Aggregate, Method 2, 1,170 ton of Asphalt Concrete Pavement, Type 1, 1,75 CY of Structural Concrete, Class A, 15 Precast, Prestressed Concrete Slabs, 250,100 pounds of Reinforced Steel, 655 LF of Bridge Railing, Concrete, 7,510 LF of Micropiles, 15 Micropile Load Verification Tests, 230 SY of Stone Masonry, 520 LF of Stone Masonry Guardwall, 155 LF of the Stone Masonry Anchor Slab Guardwall, 10,000 SY of Placing Conserved Topsoil 4" Depth, Removal of Bridge Superstructure.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
200 CY of Removal of Stone Masonry, 1,800 CY of Roadway Excavation, 1,620 CY of Structure Excavation, 1,100 CY of Structural Backfill, 1,140 ton of Roadway Aggregate, Method 2, 1,170 ton of Asphalt Concrete Pavement, Type 1, 1,75 CY of Structural Concrete, Class A, 15 Precast, Prestressed Concrete Slabs, 250,100 pounds of Reinforced Steel, 655 LF of Bridge Railing, Concrete, 7,510 LF of Micropiles, 15 Micropile Load Verification Tests, 230 SY of Stone Masonry, 520 LF of Stone Masonry Guardwall, 155 LF of the Stone Masonry Anchor Slab Guardwall, 10,000 SY of Placing Conserved Topsoil 4" Depth, Removal of Bridge Superstructure.
Bridges construction services.
Posted Date
Sep 26, 2025
Due Date
Jan 26, 2026
Release: Sep 26, 2025
Close: Jan 26, 2026
Bridges construction services.
AvailableWork to be performed under this project includes fine-milling and resurfacing the existing highway, guardrail improvements, pavement markings, and other related highway items. See attached files.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Work to be performed under this project includes fine-milling and resurfacing the existing highway, guardrail improvements, pavement markings, and other related highway items. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis