Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes coarse-milling and resurfacing of the existing highway with a leveling course, wearing course, signage, new pavement markings, and other highway related items. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of 13,600 CY, common excavation; 1,900 CY, solid rock excavation; 1,600 CY, trench excavation of earth; 160 CY, trench excavation of earth, exploratory (N.A.B.I.); 11,500 CY, 4,455 SY, coarse-milling, bituminous pavement; 4 EA, precast reinforced concrete catch basin with cast iron grate; 7 EA, precast reinforced concrete catch basin with cast iron grate (dry well); 2,624 SY, Portland cement concrete sidewalk, 5 IN; 540 SY, Portland cement concrete sidewalk, 8 IN; 30 LF, removal of guardrail; 30 LF, removal of existing fence; 5,600 TN, bituminous concrete pavement, type IIS, QA Tier I. See attached files.
Posted Date
Nov 26, 2025
Due Date
Dec 19, 2025
Release: Nov 26, 2025
Close: Dec 19, 2025
Work consists of 13,600 CY, common excavation; 1,900 CY, solid rock excavation; 1,600 CY, trench excavation of earth; 160 CY, trench excavation of earth, exploratory (N.A.B.I.); 11,500 CY, 4,455 SY, coarse-milling, bituminous pavement; 4 EA, precast reinforced concrete catch basin with cast iron grate; 7 EA, precast reinforced concrete catch basin with cast iron grate (dry well); 2,624 SY, Portland cement concrete sidewalk, 5 IN; 540 SY, Portland cement concrete sidewalk, 8 IN; 30 LF, removal of guardrail; 30 LF, removal of existing fence; 5,600 TN, bituminous concrete pavement, type IIS, QA Tier I. See attached files.
Premium
Access the largest public sector contact database
Improvements to the East Bank Sewage Treatment Plant (STP) including improvements to the North RAS Pump Station and up to three (3) final clarifiers. Alternate A: Removal & Replacement of Secondary Clarifier Mechanism No. 7, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational. Alternate B: Removal & Replacement of Secondary Clarifier Mechanism No. 6, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational. Alternate C: Removal & Replacement of Secondary Clarifier Mechanism No. 8, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational.
Posted Date
Dec 9, 2025
Due Date
Jan 27, 2026
Release: Dec 9, 2025
Close: Jan 27, 2026
Improvements to the East Bank Sewage Treatment Plant (STP) including improvements to the North RAS Pump Station and up to three (3) final clarifiers. Alternate A: Removal & Replacement of Secondary Clarifier Mechanism No. 7, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational. Alternate B: Removal & Replacement of Secondary Clarifier Mechanism No. 6, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational. Alternate C: Removal & Replacement of Secondary Clarifier Mechanism No. 8, Drive, Bridge Assembly, and Ancillary Equipment Systems Complete and Operational.
AvailableIrrigation Piping involving irrigation system, aggregate surfacing, asphalt paving, fencing, grading and traffic control work on US 16 beginning at RM 27.90 between and Buffalo.
Posted Date
Sep 17, 2024
Due Date
Mar 31, 2026
Release: Sep 17, 2024
Close: Mar 31, 2026
Irrigation Piping involving irrigation system, aggregate surfacing, asphalt paving, fencing, grading and traffic control work on US 16 beginning at RM 27.90 between and Buffalo.
AvailableLevel, Overlay and Chip Seal involving asphalt paving, fencing, chip seal, traffic control and milling work on approx. 12.80 miles on WYO 387 beginning at RM 102.05 between and Wright.
Posted Date
Sep 17, 2024
Due Date
Apr 30, 2026
Release: Sep 17, 2024
Close: Apr 30, 2026
Level, Overlay and Chip Seal involving asphalt paving, fencing, chip seal, traffic control and milling work on approx. 12.80 miles on WYO 387 beginning at RM 102.05 between and Wright.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis