Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Level, Overlay and Chip Seal involving asphalt paving, fencing, chip seal, traffic control and milling work on approx. 12.80 miles on WYO 387 beginning at RM 102.05 between and Wright.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes boggy meadow road accessible trail construction.
Posted Date
Dec 3, 2025
Due Date
Dec 29, 2025
Release: Dec 3, 2025
Close: Dec 29, 2025
Project includes boggy meadow road accessible trail construction.
AvailablePremium
Access the largest public sector contact database
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
AvailableWork consists of concrete trails, seatwalls, playground, furnishings, sprinkler irrigation, grading, planting, grassing, and landscape maintenance.
Posted Date
Dec 11, 2025
Due Date
Dec 23, 2025
Release: Dec 11, 2025
Close: Dec 23, 2025
Work consists of concrete trails, seatwalls, playground, furnishings, sprinkler irrigation, grading, planting, grassing, and landscape maintenance.
AvailableThe Town of Jackson, WY seeks proposals for ecological monitoring at the 42-acre Karns Meadow Park to assess impacts of recreation and park development on vegetative cover and wildlife. Monitoring will occur before, during, and after construction (2027–2029) and include annual reports, proposed additional studies, and development of ecological thresholds to inform an adaptive management plan.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
The Town of Jackson, WY seeks proposals for ecological monitoring at the 42-acre Karns Meadow Park to assess impacts of recreation and park development on vegetative cover and wildlife. Monitoring will occur before, during, and after construction (2027–2029) and include annual reports, proposed additional studies, and development of ecological thresholds to inform an adaptive management plan.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis