Posted
Aug 26, 2026
Oct 2, 2026
Rehabilitation of Auloa Road Bridge Over Maunawili Stream, Bridge No. 407
Repair of spalls and delaminations at bridge railings, deck soffit, beams, pile caps; installation of pile restoration system at a decayed timber pile; installation of pile wrap protection system at exposed timber piles; application of a surface applied migrating corrosion inhibitor to exposed concrete surfaces; installation of traffic control devices; and all other incidental work necessary to complete the project.
