Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition and reconstruction of the gymnasium building creating a 9,805 SF facility, along with related site work and improvements, in a site located in Heritage Park, in Griffin, Spalding County, Georgia and includes building/site demolition, new utilities with connections to municipal services, new grading/drainage, new storm sewer systems, new concrete sidewalks, selective demolition of limited building components, new foundations, new slab on grade, new load bearing foundations/Structural Steel/Cold Formed Steel Roof Framing, new metal framed stairs, new masonry veneers, new exterior window/door systems, new roof/fascia/eave systems, new building insulation, new interior metal stud framed walls, new interior floor/base/wall/ceiling finishes, new interior architectural millwork, new interior doors, new interior accessories/equipment, new plumbing fixture/piping systems, new HVAC/ductwork systems, , new fire protection, new primary/secondary/general electrical distribution systems, new lighting systems and fire alarm devices/systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contract bp-602 demo & abatement work #2.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
Contract bp-602 demo & abatement work #2.
Provide contract BP-601 demo & abatement work #1.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
Provide contract BP-601 demo & abatement work #1.
work consist of 725 LF of demo/disposal of existing reinforced concrete cap, 707 LF of remove 1-1/4" water services, 1 EA of remove 1-1/4" valve, 1 EA of remove 1-1/4" meter, 1 EA of remove1-1/4" rpz backflow preventer, 2818 SY of remove concrete/brick hardscape, 15 EA of tree removal, 7256 LF of furnish and install frp creative composites series 1432 sheet piles 25' length, 725 LF of furnish and install reinforced concrete cap, 725 LF of furnish and install double angle water, 54 EA of furnish and install tiebacks w/concrete deadman, 101 CY of #57 stone backfill. See outside link.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
work consist of 725 LF of demo/disposal of existing reinforced concrete cap, 707 LF of remove 1-1/4" water services, 1 EA of remove 1-1/4" valve, 1 EA of remove 1-1/4" meter, 1 EA of remove1-1/4" rpz backflow preventer, 2818 SY of remove concrete/brick hardscape, 15 EA of tree removal, 7256 LF of furnish and install frp creative composites series 1432 sheet piles 25' length, 725 LF of furnish and install reinforced concrete cap, 725 LF of furnish and install double angle water, 54 EA of furnish and install tiebacks w/concrete deadman, 101 CY of #57 stone backfill. See outside link.
Work includes rehabilitation of Riverwalk trails and the portage along the edge of St. Joseph River between the East Race headgates and Jefferson Boulevard and includes construction of site improvements including but not limited to boardwalks, concrete sidewalks, planters, site lighting, landscaping, parking lot rehabilitation and a new stair connection on the north side of Jefferson Boulevard bridge as well as removal and replacementof the concrete stairs on the south side of Jefferson Boulevard into Howard Park in South Bend.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Work includes rehabilitation of Riverwalk trails and the portage along the edge of St. Joseph River between the East Race headgates and Jefferson Boulevard and includes construction of site improvements including but not limited to boardwalks, concrete sidewalks, planters, site lighting, landscaping, parking lot rehabilitation and a new stair connection on the north side of Jefferson Boulevard bridge as well as removal and replacementof the concrete stairs on the south side of Jefferson Boulevard into Howard Park in South Bend.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis