Demolish the existing scoreboards and install owner furnished contractor installed scoreboards. Work shall include, but not limited to demolition and removal of the existing scoreboards and supports columns chipping out and removal of existing below footing to a minimum depth of 6-12": furnishing and installing of concrete foundations and steel support columns; installation of underground conduits and concrete paving; setting and installing of the new scoreboards; installation of electrical conduits; conductors, pull boxes, grounding systems and associated power and controls connections. Contractor shall provide necessary connections, terminations, testing, and coordination required to deliver a complete operational and fully functional scoreboard installation. Contractor with the scoreboard manufacture for commissioning, startup, testing and final system acceptance.