Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Heritage center boiler replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contractors for the replacement of one (1) existing laars boiler at the us bank building, the facility currently has two (2) boilers. Only one boiler shall be replaced. The new boiler shall be the same size as the existing unit or an approved equal and must be capable of communicating with the existing boiler, which will remain in service.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
Contractors for the replacement of one (1) existing laars boiler at the us bank building, the facility currently has two (2) boilers. Only one boiler shall be replaced. The new boiler shall be the same size as the existing unit or an approved equal and must be capable of communicating with the existing boiler, which will remain in service.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Boiler replacement.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Boiler replacement.
AvailableReplace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
Posted Date
Nov 5, 2025
Due Date
Jan 26, 2026
Release: Nov 5, 2025
Close: Jan 26, 2026
Replace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
AvailableThe project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →