Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Eastvale is soliciting proposals from qualified firms to provide professional engineering and environmental services for the Hellman Avenue Street Widening Project, including roadway and bridge design and environmental compliance. The project will widen Hellman Avenue to alleviate a traffic bottleneck and may include an optional task to develop school traffic drop‑off/pick‑up improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the widening of Stewart Avenue.
Posted Date
Dec 24, 2025
Due Date
Jan 8, 2026
Release: Dec 24, 2025
Close: Jan 8, 2026
Procurement of services for the widening of Stewart Avenue.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform: Part I: Widen the existing 2-lanes asphalt road section with roadside ditches to a 5-lanes reinforced concrete road section with a storm sewer system and reconstruct Wichita street, from the IH 20 to Roy C. Brooks Boulevard. Part IA: Water and Sanitary Sewer relocation and adjustment of facilities on Wichita Street. Water line extension from E. Altamesa Boulevard to 400 feet south of Tiffany Meadows Lane, to eliminate everman deduct meter.
Posted Date
Dec 12, 2025
Due Date
Jan 29, 2026
Release: Dec 12, 2025
Close: Jan 29, 2026
Perform: Part I: Widen the existing 2-lanes asphalt road section with roadside ditches to a 5-lanes reinforced concrete road section with a storm sewer system and reconstruct Wichita street, from the IH 20 to Roy C. Brooks Boulevard. Part IA: Water and Sanitary Sewer relocation and adjustment of facilities on Wichita Street. Water line extension from E. Altamesa Boulevard to 400 feet south of Tiffany Meadows Lane, to eliminate everman deduct meter.
AvailableThe work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
AvailableWork consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Work consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.