Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the following: This project consists of the demolition of an existing Steel Beam Continuous Bridge and the construction of a replacement Reinforced Concrete Haunched Slab (R.C.S.H.) Bridge over the Middle Branch Emma Creek. The existing bridge is a 3-span, 110-foot-long structure with a concrete deck, abutments, and piers. The replacement structure is a 120-foot-long R.C.S.H. bridge with a 28-foot-wide roadway. Associated improvements will include concrete approach slabs, steel guardrail, embankment grading, riprap slope protection, and roadway rehabilitation and reconstruction. The roadway rehabilitation and reconstruction will include full-depth repair, base construction, and a 2” mill and overlay. The construction will include temporary and permanent erosion control measures, traffic control, and signing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableBridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
AvailableBridge replacement (2 structures); involving removing concrete bridges, excavation, installing steel piling, stormwater control components, precast wall components, and concrete slab bridge beams, placing structural concrete, approach slabs, road base, and asphalt pavement, and installing box beam guardrail.
Posted Date
-
Due Date
Jan 26, 2026
Close: Jan 26, 2026
Bridge replacement (2 structures); involving removing concrete bridges, excavation, installing steel piling, stormwater control components, precast wall components, and concrete slab bridge beams, placing structural concrete, approach slabs, road base, and asphalt pavement, and installing box beam guardrail.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis