Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York State Department of Transportation
Bridge deck replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
New York State Bridge Authority
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
New York State Bridge Authority
Close: Jan 7, 2026
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Douglas County
Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Douglas County
Close: Dec 16, 2025
Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
AvailableMissouri Department of Transportation
Work includes 1 LS protective coating - concrete bents and piers (urethane); 202 LF type d barrier; 322 SY slab on steel; 18 SY bridge approach slab (minor road); 2,755 SF removal of existing bridge deck; 6 SF SHF-flat sheet fluorescent; 6 EA. concrete post anchor for 2.5 in. Psst. - 7 GA.; 96 LF 2.5 in. Psst post - 12 ga.; 2 EA. breakaway assembly (perforated square steel tube); 325 LF MGS guardrail; 4 EA. asymmetrical transition section, 6.5' Posts.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 1 LS protective coating - concrete bents and piers (urethane); 202 LF type d barrier; 322 SY slab on steel; 18 SY bridge approach slab (minor road); 2,755 SF removal of existing bridge deck; 6 SF SHF-flat sheet fluorescent; 6 EA. concrete post anchor for 2.5 in. Psst. - 7 GA.; 96 LF 2.5 in. Psst post - 12 ga.; 2 EA. breakaway assembly (perforated square steel tube); 325 LF MGS guardrail; 4 EA. asymmetrical transition section, 6.5' Posts.
AvailableSandusky County
Bridge replacement.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →