Retrieving RFP details
Release
Close
Missouri Department of Transportation
Work includes 1 LS protective coating - concrete bents and piers (urethane); 202 LF type d barrier; 322 SY slab on steel; 18 SY bridge approach slab (minor road); 2,755 SF removal of existing bridge deck; 6 SF SHF-flat sheet fluorescent; 6 EA. concrete post anchor for 2.5 in. Psst. - 7 GA.; 96 LF 2.5 in. Psst post - 12 ga.; 2 EA. breakaway assembly (perforated square steel tube); 325 LF MGS guardrail; 4 EA. asymmetrical transition section, 6.5' Posts.
JCD0074, 251212-D04, FAS S403(74) - Bridge Deck Replacement Route 179 Bridge over Rock Creek
zip
Missouri Department of Transportation
Work includes 107 SY bridge approach slab (minor road); 751 SY slab on steel; 506 LF type h barrier; 13 LF guardrail type A; 50 LF MGS guardrail; 3 EA. MGS bridge approach transition section (regular/no curb); 1 EA. bridge anchor section, 6.5' Posts (safety barrier curb) (roadway and rehabilitation work only); 2 EA. type a crashworthy end terminal (mash); 187 LF silt fence; 40 LF rock ditch check; 948 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 593 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads).
Missouri Department of Transportation
Work includes 512 SY type 5 aggregate for base (6" Thick); 512 SY misc. Optional pavement (11" BP vs. 9" JCPC); 39 CY furnishing type 3 rock ditch liner; 557 CY furnishing type 2 rock blanket; 855 SF construction signs; 580 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 363 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads); 10 LF rock ditch check; 860 LF silt fence; 581 SY type 3B erosion control blanket; 250. 000 LF MGS guardrail.
Missouri Department of Transportation
The work consist of approx 225 LF guardrail 8 FT posts 6 FT 3" spacing; 122 SY bridge approach slab; 1,823 LF 14" galvanized structural steel piles; 1,200 LF 4" white class pavement marking; 1,084 LF silt fence.
Release
Nov 06, 2025
Close
Dec 12, 2025