Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Sealing concrete bridge rail and bridge deck cracks.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Sealing concrete bridge rail and bridge deck cracks.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge deck rehabilitation.
Posted Date
Oct 21, 2025
Due Date
Jan 30, 2026
Release: Oct 21, 2025
Close: Jan 30, 2026
Bridge deck rehabilitation.
AvailableProvide bridge deck milling & membrane waterproofing includes pavement planing of the bridge deck and approach slabs, installing a membrane waterproofing and resurfacing with asphalt concrete.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide bridge deck milling & membrane waterproofing includes pavement planing of the bridge deck and approach slabs, installing a membrane waterproofing and resurfacing with asphalt concrete.
AvailableThe work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Posted Date
Jan 9, 2026
Due Date
Mar 26, 2026
Release: Jan 9, 2026
Close: Mar 26, 2026
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.