Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Pitkin County
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Taylor County
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Taylor County
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailablePreble County
DESIGN-BUILD. Bridge replacement project.
Posted Date
Oct 15, 2025
Due Date
Dec 3, 2025
Release: Oct 15, 2025
Preble County
Close: Dec 3, 2025
DESIGN-BUILD. Bridge replacement project.
AvailableGreene Township
Bridge work includes the replacement of the existing prestressed concrete non-composite adjacent box beam superstructure. The new superstructure will consist of (4) 48" x 21" prestressed concrete composite spread box beams with an 8β cast-in-place concrete deck with vertical all barriers. Minor substructure work will also be performed including deteriorated concrete repairs, crack sealing, beam set modifications, and waterproofing. Minimal approach roadway work will also be included for the project.
Posted Date
-
Due Date
Dec 11, 2025
Release: -
Greene Township
Close: Dec 11, 2025
Bridge work includes the replacement of the existing prestressed concrete non-composite adjacent box beam superstructure. The new superstructure will consist of (4) 48" x 21" prestressed concrete composite spread box beams with an 8β cast-in-place concrete deck with vertical all barriers. Minor substructure work will also be performed including deteriorated concrete repairs, crack sealing, beam set modifications, and waterproofing. Minimal approach roadway work will also be included for the project.
AvailablePlumas County
Plumas County seeks qualified firms for construction phase engineering services for the Snake Lake Road Bridge Replacement Project. Services include contract administration, inspection, and material testing for a new two-lane bridge. The project involves replacing a structurally deficient bridge with a precast concrete structure, requiring dewatering and temporary detour bridge installation.
Posted Date
Oct 28, 2025
Due Date
Jan 16, 2026
Release: Oct 28, 2025
Plumas County
Close: Jan 16, 2026
Plumas County seeks qualified firms for construction phase engineering services for the Snake Lake Road Bridge Replacement Project. Services include contract administration, inspection, and material testing for a new two-lane bridge. The project involves replacing a structurally deficient bridge with a precast concrete structure, requiring dewatering and temporary detour bridge installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis