Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Preble County
DESIGN-BUILD. Bridge replacement project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Huron County
Peru west section line road bridge replacement design/build project.
Posted Date
Oct 31, 2025
Due Date
Dec 18, 2025
Release: Oct 31, 2025
Huron County
Close: Dec 18, 2025
Peru west section line road bridge replacement design/build project.
AvailableCobb County
DESIGN/BUILD project for design and construction services necessary to improve the intersection of road project.
Posted Date
Jul 11, 2025
Due Date
Jan 22, 2026
Release: Jul 11, 2025
Cobb County
Close: Jan 22, 2026
DESIGN/BUILD project for design and construction services necessary to improve the intersection of road project.
AvailableNew Jersey Department of Transportation
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
New Jersey Department of Transportation
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableGreene Township
Bridge work includes the replacement of the existing prestressed concrete non-composite adjacent box beam superstructure. The new superstructure will consist of (4) 48" x 21" prestressed concrete composite spread box beams with an 8” cast-in-place concrete deck with vertical all barriers. Minor substructure work will also be performed including deteriorated concrete repairs, crack sealing, beam set modifications, and waterproofing. Minimal approach roadway work will also be included for the project.
Posted Date
-
Due Date
Dec 11, 2025
Release: -
Greene Township
Close: Dec 11, 2025
Bridge work includes the replacement of the existing prestressed concrete non-composite adjacent box beam superstructure. The new superstructure will consist of (4) 48" x 21" prestressed concrete composite spread box beams with an 8” cast-in-place concrete deck with vertical all barriers. Minor substructure work will also be performed including deteriorated concrete repairs, crack sealing, beam set modifications, and waterproofing. Minimal approach roadway work will also be included for the project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis